Toyota Yaris Forums - Ultimate Yaris Enthusiast Site
 

 


 
Go Back   Toyota Yaris Forums - Ultimate Yaris Enthusiast Site > Technical Forums > Cosmetic Modifications (Exterior/Interior)
  The Tire Rack

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-05-2015, 10:10 AM   #4
paulge3
 
Drives: '11 Yaris
Join Date: Feb 2015
Location: Ga
Posts: 42
Factory paint is baked at a higher temperature for a longer period of time while local body shops do it at a lower temperature for a shorter time, so repainting your hood needs some time to fully cured. The recommend waiting time is 30 days.
paulge3 is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:02 AM.




YarisWorld
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.